Goal N-3: Airport and Land Use Environs – Implementation Actions [Table N-3 part 3]:

Ref # Implementation Action Agency / Time Frame GOAL N-3: Protect sensitive land uses from airport related noise impacts. 3.1 Aircraft altitude standards. Continue working with the Federal Aviation Administration to determine appropriate altitude standards for aircraft flying over congested areas, taking into account public health and safety. PBA Ongoing 3.2 Helicopter noise. Continue cooperation with the … Continued

About Implementation

An implementation plan is a coordinated series of actions the City desires to take in the future that are intended to advance, over the long term, the City’s Shared Vision, Core Values, and the General Plan goals and policies. An implementation plan is thus a follow-up measure for this element. Taken as a whole, these … Continued

About Implementation

An implementation plan is a coordinated series of actions the City desires to take in the future that are intended to advance, over the long term, the City’s Shared Vision, Core Values, and the General Plan goals and policies. An implementation plan is thus a follow-up measure for this element. Taken as a whole, these … Continued

Goal N-2: Noise Generators – Implementation Actions [Table N-3 part 2]:

Ref # Implementation Action Agency / Time Frame GOAL N-2: Reduce the impact of known sources of noise and vibration. 2.1  Alternative paving. Evaluate the use of alternative paving materials that can reduce traffic noise, as feasible, depending on roadway conditions and cost-efficiency. PWA 2024 2.2 Freeways. Continue cooperation with Caltrans in the planning of noise attenuation … Continued

Goal N-1: Land Use Compatibility – Implementation Actions [Table N-3 part 1]:

Ref # Implementation Action Agency / Time Frame Goal N-1: Ensure that existing and future land uses are compatible with current and projected local and regional noise conditions. 1.1 City equipment. As feasible and practical, new equipment purchased by the City will meet noise performance standards consistent with the best available noise reduction technology. PWA/Finance Ongoing … Continued

Goal CN-4: Water Resources – Implementation Actions [Table CN-3 part 4]:

Ref # Implementation Action Agency/ Time Frame GOAL CN-4: Conserve and replenish existing and future water resources. 4.1 Water education. Provide educational outreach materials for residents and businesses on proper water use and other water conservation practices. PWA Ongoing 4.2 Water smart landscapes. Promote awareness of the City Landscape and Parkway Improvement Guidelines to require public projects … Continued

Goal CN-3: Energy Resources – Implementation Actions [Table CN-3 part 3]:

Ref # Implementation Action Agency / Time Frame GOAL CN-3: Reduce consumption of and reliance on nonrenewable energy, and support the development and use of renewable energy sources. 3.1 CALGreen voluntary measures. Evaluate the feasibility of adopting CALGreen building code nonresidential voluntary measures as mandatory measures by the City. PBA 2023 3.2 LEED/ENVISION certification. Evaluate the feasibility … Continued

Goal CN-2: Natural Resources – Implementation Actions [Table CN-3 part 2]:

Ref # Implementation Action Agency / Time Frame GOAL CN-2: Preserve and enhance Santa Ana’s natural and environmental resources while maintaining a balance between recreation, habitat restoration, and scenic resources. 2.1 Native planting. Evaluate opportunities in parks, open spaces, scenic linkages, and greenway corridors to restore native vegetation and establish, where appropriate, native plantings that require … Continued