Goal M-3: Active Transportation – Implementation Actions [Table M-4 part 3]:

Ref #

Implementation Action

Agency /
Time Frame

GOAL M-3: A safe, balanced, and integrated network of travelways for nonmotorized modes of transportation that connects people to activity centers, inspiring healthy and active lifestyles.

3.1

Active transportation planning. Develop and pursue implementation of a comprehensive active transportation plan.

PWA     2022-2035

3.2

Circulation connectivity. Close the Golden Loop network between Memory Lane and Santiago Creek and between Santiago Park and Lincoln Avenue/Santiago Street.

PWA/PRCSA
Ongoing

3.3

Pedestrian accessibility. Implement the City ADA Transition Plan to cost-effectively enhance pedestrian accessibility, with guidance from the Sidewalk Connectivity Plan.

PWA
Ongoing

3.4EJ action icon (Community Element) 

 

Pedestrian opportunity zones. Prepare public realm plans in pedestrian opportunity zones.

PWA/PBA 2022-2035

3.5

Safe routes to schools and parks. Develop and pursue implementation of a Safe Routes to School Plan and a Safe Routes to Parks Plan.

PWA/PRCSA
Ongoing

3.6

Drinking water access. Create a network of public water fountains / bottle fill stations that promote the City’s award-winning water, conservation, and substitution of bottled water for affordable public drinking water.

PWA     2022-2035