FAQ Topic: Implementation

Goal S-4: Aircraft Hazards – Implementation Actions [Table S-2 part 4]:

Ref # Implementation Action Agency / Time Frame GOAL S-4: Protect the safety of the general public from aircraft hazards. 4.1 Coordination. Continue to collaborate internally and with adjacent jurisdictions, appropriate agencies, and the Orange County Airport Land Use Commission as needed on potential development applications and ongoing programs affecting land use and development, affordable housing, … Continued

Goal S-3: Geologic and Seismic Hazards – Implementation Actions [Table S-2 part 3]:

Ref # Implementation Action Agency / Time Frame GOAL S-3: Provide a safe environment for all Santa Ana residents and workers while minimizing risk of injury, loss of life, property damage, and social and economic impacts caused by geologic and seismic hazards. 3.1 Public utilities. Coordinate with the California Public Utilities Commission and/or utilize the Capital … Continued

Goal S-2: Hazardous Materials – Implementation Actions [Table S-2 part 2]:

Ref # Implementation Action Agency / Time Frame GOAL S-2: Protect residents and environmental resources from contaminated hazardous material sites and minimize risks associated with the use, production, storage, transport, and disposal of hazardous materials. 2.1 Facility location. Identify options to prohibit new facilities involved in the production, use, storage, transport, or disposal of hazardous materials … Continued

About Implementation

An implementation plan is a coordinated series of actions the City desires to take in the future that are intended to advance, over the long term, the City’s Shared Vision, Core Values, and the General Plan goals and policies. An implementation plan is thus a follow-up measure for this element. Taken as a whole, these … Continued

Goal S-1: Flood Safety – Implementation Actions [Table S-2 part 1]:

Ref # Implementation Action Agency / Time Frame GOAL S-1: Protect life and minimize property damage, social and economic disruptions caused by flood and inundation hazards. 1.1 Agency coordination. Communicate with FEMA annually regarding updates to Flood Insurance Rate Maps and Letter of Map Revisions. PBA Ongoing 1.2 Flood resistant buildings. Require that new structures in or … Continued